How to Cut Audio with Podcastle in 3 Simple Steps

If you're looking for an easy way to cut audio, Podcastle is the perfect solution. In just three simple steps, you can have your audio sliced and diced exactly the way you want it. In this article, we're going to show you how to cut your audio online using our free audio cutter. So, let's get straight to it.

How to Cut Audio in Podcastle

1) Record or import your audio

First things first, open Podcastle and log into your account. If you don’t have an account yet, simply sign up to Podcastle through your Facebook or Google accounts. Once there, click Create> Project. Then choose Import Audio or Record Audio to get your audio track in Podcastle’s online editor. Once you record your audio or import it to the dashboard, it will look something like this:

2) Split your audio

Now it’s time to start cutting your audio! There might be several reasons why you’d want to cut audio tracks. Maybe you want to trim out some of the beginning or end of the track that isn’t relevant. Or maybe you want to split the track into multiple segments to make it easier to work with. Whatever it is, splitting your audio is extremely easy with Podcastle. There are a couple of ways you can select the splitting tool.

-- Right click on the audio track and scroll down the menu to select the Split option
-- Click on the mouse icon from the menu down the dashboard and choose the Split icon
-- Simply press 2 or hold C and you'll activate the shortcut for the Split tool

3) Make the necessary changes

Now that you’ve selected the Split tool, all you need to do is find the spot where you want to cut your audio and click on it. This way, you’ll split your audio into two separate parts.If you want to cut your audio in more than two tracks, simply apply the split tool as many times as required. Once done, don’t forget to get back to the Selection tool by clicking 1.

That’s it! This is pretty much all you need to cut audio tracks with Podcastle. Now let’s understand how you can take your audio editing to the next level, by using some of the other editing tools in Podcastle.

Edit Your Audio Further

4) Fade in & out

If you want the transition between your different cuts to be smoother, you need to apply the fade-in or fade-out effects. Luckily, it's pretty easy to do with Podcastle. Simply hover over your audio track until two dots appear on both sides of your recording. If you select the left one and push it to the right, you'll apply the fade-in effect. If you want to apply the fade-out, do vice-versa: move the right dot to the left.

5) Add music

Do you want to make your audio a little more entertaining? Then it might be a good idea to add some music to it! The best part is that with Podcastle you don’t need to worry about the copyrights. Our library has collected hundreds of royalty-free music tracks in one place, which you can use to enhance your audio. To access them click on the Music icon on the left side of the dashboard. In this example, we’ve chosen one of the classical tracks from Podcastle’s library and dragged and dropped it to the editing dashboard.

As you can see, the music track here is a little too long for our audio. So we’re going to apply the Split tool one more time. After cutting out the unnecessary parts, you can also simply hover over the audio and trim the track as short as you need. Once done, don’t forget  to apply the fade in & out effects!

6) Enjoy the final results and export!

That’s pretty much it! Here is how our project looks in the end. Now all you have to do is export it and share it with others! And of course, don’t forget to listen to it one more time, and enjoy the results.

Final Thoughts

If you need to cut audio, you know where to go! Cutting audio tracks and editing audio with Podcastle is super easy. With just a few simple steps, you can make your audio sound great! And the best part is that all of this can be done online and without downloading any extra software. So why not give it a try today?

FAQ

How do I crop audio files?
You can easily crop audio files with Podcastle. Simply select the Split tool from the menu down the dashboard and click on the spot where you want to cut your audio. You can split your audio into multiple parts if needed, then trim and fade each part as required. Once done, don’t forget to export it!

Can you trim an audio file?
Yes, Podcastle also has an audio trimmer. To access it, simply hover over your audio track and you'll select the trim tool! Once selected, you can trim your audio as much as needed.

How can I crop MP3 songs?

Looking for an MP3 cutter, online & free? No need to. Podcastle is the perfect tool to cut your music online. So how to cut MP3 files with Podcastle? Just follow the same flow. Upload your MP3 file to the dashboard, choose the Split tool and cut it out!

You've successfully subscribed to Podcastle Blog
Great! Next, complete checkout to get full access to all premium content.
Error! Could not sign up. invalid link.
Welcome back! You've successfully signed in.
Error! Could not sign in. Please try again.
Success! Your account is fully activated, you now have access to all content.
Error! Stripe checkout failed.
Success! Your billing info is updated.
Error! Billing info update failed.